
Warehouse for lease
Carmona, Cavite · Wet standpipe plans & bill of materials
We prepare your fire protection plans and documents, signed and sealed by licensed Professional Engineers (PME, PEE, PECE), ready for submission. Serving Central Luzon (Region 3), CALABARZON and Metro Manila.

We prepare the plans and documents your submission needs, signed and sealed by the right engineer.
We prepare what's missing, from as-built drawings to calculations, so you can complete your requirements.
After a renovation or change of use, we update the plans to reflect what's actually installed.
Plans and documents are signed and sealed by the right licensed Professional Engineer for each system (PME, PEE or PECE). Sprinkler plans are signed by a PME.
Occupancy, floor plans, existing systems and what your submission requires.
System layouts and the calculations behind them, such as hydraulic calculations for sprinklers.
Drawings, details and specifications for each system.
Each plan signed and sealed by the licensed Professional Engineer for that system.
A complete set of plans and documents handed over for your submission.

Carmona, Cavite · Wet standpipe plans & bill of materials

Bacoor, Cavite · Smoke control simulation (PyroSim / FDS)

Meycauayan, Bulacan · Fire Safety Maintenance Report (FSMR)
Yes. We prepare the plans and documents, signed and sealed by the right licensed Professional Engineer for each system (PME, PEE or PECE), ready for submission.
Yes. We prepare the plans even if another contractor installs the system, and we also offer paid supervision during the installation.
Yes. We prepare as-built plans for systems that are already installed.
Usually within one week. It can take longer when our schedule is full, so we'll confirm the timeline when we quote.
Send your floor plan or BFP findings and we'll reply within one business day.